480

1. Vain Dan, Byewash Dan, Bungalow, and Road Diversions $ 505,000.

2. Catchwater to East 40,000.

3. Main to Filter Beds 24,000.

4. Filter Beds 20,000.

5. Vain from Filter Beds to Service Reservoir 100,000.

6. Service Reservoir at Kowloon Tong 70,000.

7. Connection to and extension of existing distributing system 70,000.

8. Service Reservoir at Kowloon City 7,000.

9. Fire Hydrants on existing system 4,000.

Total $ 840,000.

Item No. 1 covers the 1st. and 2nd. and part of the 4th. items in K. Gibbs' original scheme, no comparison is however possible, the site, height, and material of the main dam having been changed on the recommendation of Mr. Chadwick and Mr. Ornsby.

Item No. 3 shows a considerable increase above the original scheme, the size of the main having been increased to allow for the reduced head caused by altering the site of dam.

Item No. 4 is for Filter Beds more than twice the size of those originally contemplated.

In the other items the increase is due to the general rise of prices that has taken place since Mr. Gibbs' report was written.

We have etc.,

(Sd.) Denison and Ram.

Edit History

2026-06-01 02:43:28 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
480 1. Vain Dan, Byewash Dan, Bungalow, and Road Diversions $ 505,000. 2. Catchwater to East 40,000. 3. Main to Filter Beds 24,000. 4. Filter Beds 20,000. 5. Vain from Filter Beds to Service Reservoir 100,000. 6. Service Reservoir at Kowloon Tong 70,000. 7. Connection to and extension of existing distributing system 70,000. 8. Service Reservoir at Kowloon City 7,000. 9. Fire Hydrants on existing system 4,000. Total $ 840,000. Item No. 1 covers the 1st. and 2nd. and part of the 4th. items in K. Gibbs' original scheme, no comparison is however possible, the site, height, and material of the main dam having been changed on the recommendation of Mr. Chadwick and Mr. Ornsby. Item No. 3 shows a considerable increase above the original scheme, the size of the main having been increased to allow for the reduced head caused by altering the site of dam. Item No. 4 is for Filter Beds more than twice the size of those originally contemplated. In the other items the increase is due to the general rise of prices that has taken place since Mr. Gibbs' report was written. We have etc., (Sd.) Denison and Ram.
Baseline (Original)
E 480 1. Vain Dan, Byewash Dan, Bungalow, and Road Diversions 2. Catchwater to East 3. Main to Filter Beds 4. Filter Beds $ 505,000. 40,000. 24,000. 20,000. 5. Vain from Filter Beds to Service Reservoir 100,000. 8. Service Reservoir at Kowloon Tong 70,000. 7. Connection to and extension of existing distributing system 70,000. 8. Service Reservoir at Kowloon City 7,000. 9, Fire Hydrants on existing system 4,000. Total $ 840,000. Item No. 1 covers the 1st. and 2nd. and part of the 4th. items in K. Gibbe' original scheme, no comparison is however possible, the site, height, and material of the main dan having been changed on the recommendation of Mr. Chadwick and Mr. Ornsby. Item No. 3 shows a considerable increase above the original scheme, the size of the main having been increased to allow for the reduced head caused by altering the site of dam. Item No. 4 is for Filter Beds more than twice the size of those originally contemplated. In the other items the increase is due to the general rise of prices that has taken place since Mr. Gibbs' report was written. We have etc., (Sd.) Denison and Ram.
2026-06-01 02:43:28 · Baseline
View content

E

480

1. Vain Dan, Byewash Dan, Bungalow, and Road Diversions

2. Catchwater to East

3. Main to Filter Beds

4. Filter Beds

$ 505,000.

40,000.

24,000.

20,000.

5. Vain from Filter Beds to Service Reservoir

100,000.

8. Service Reservoir at Kowloon Tong

70,000.

7. Connection to and extension of existing distributing

system

70,000.

8. Service Reservoir at Kowloon City

7,000.

9, Fire Hydrants on existing system

4,000.

Total

$ 840,000.

Item No. 1 covers the 1st. and 2nd. and part of the 4th. items in K. Gibbe' original scheme, no comparison is however possible, the site, height, and material of the main dan having been changed on the recommendation of Mr. Chadwick and Mr. Ornsby.

Item No. 3 shows a considerable increase above the original scheme, the size of the main having been increased to allow for the reduced head caused by altering the site of dam.

Item No. 4 is for Filter Beds more than twice the

size of those originally contemplated.

In the other items the increase is due to the general rise of prices that has taken place since Mr. Gibbs' report was written.

We have etc.,

(Sd.) Denison and Ram.